HomeDivisionsGRID APEX
GRID APEX Engineering Infrastructure Brand Mark

HT/LT Engineering & Substation Switchgear

Turnkey 33kV/11kV substation bays, VCB switchgear panels, PWD Electrical Inspectorate clearances, and MPCB-certified zero-power thermal waste decomposition systems.

PWD Licenced Electrical ContractingEngineered high-voltage transformer installations, low-tension distribution boards, and Central Government patented zero-electricity solid waste treatment units.
GRID APEX
Click to Inspect
HT SUBSTATION & TRANSFORMER SETUP

Visual Offerings & Real Specimens

Authentic real-world specimens and process deliverables so you can clearly see what we execute.

High-Voltage Switchgear & Transformer Specimen
HT/LT Substation Execution
Click to Inspect
Turnkey Commissioning

HT/LT Substation Execution

Heavy electrical infrastructure designed and certified to PWD norms

Transformer substations, HT/LT switchboards, busbars, and power cables installed by certified contractors under engineer supervision.

Distribution Switchgear Specimen
LT Switchgear & Power Panels
Click to Inspect
Industrial Grade

LT Switchgear & Power Panels

Industrial distribution boards with thermal protection and circuit zoning

Engineered motor control centers, sub-distribution panels, and energy metering boards configured for resilient facility operations.

Environmental Waste Conversion Specimen
Zero-Energy Solid Waste Tech
Click to Inspect
Eco Engineering

Zero-Energy Solid Waste Tech

Decentralized waste reduction with zero electricity consumption

Patented magnetic combustion machine that safely reduces organic and mixed non-recyclable solid waste right at housing societies and campuses.

Why Entrust Heavy Electrical Infrastructure to GRID APEX

From high-voltage substations powering iconic hospitality landmarks to patented zero-power solid waste treatment systems.

(01) PROTOCOL PILLAR

Why GRID APEX & JC Apex

Institutional Engineering Pedigree

  • Trusted track record across Mumbai marquee luxury hospitality landmarks, multinational specialty chemical complexes, and heavy precision manufacturing plants across the MMR industrial corridors.
  • Complete high-voltage and low-voltage competence covering 11kV/33kV substations, power transformers, vacuum circuit breakers, and certified cable termination.
  • Strategic government tender panel empanelment consultancy empowering electrical contractors to bid for major public sector contracts.
(02) PROTOCOL PILLAR

Why Engineered Substations & Solid Waste Tech

Zero Downtime & On-Site Circularity

  • Uninterruptible power delivery: luxury hotels, hospitals, and industrial production plants cannot tolerate switchgear failure or harmonic distortions.
  • Mandatory statutory PWD Electrical Inspectorate compliance and preventive maintenance protect facilities from catastrophic transformer fires.
  • Decentralized waste processing: patented zero-energy magnetic solid waste machines eliminate municipal tipping fees and composting odors right at source.
(03) PROTOCOL PILLAR

Why Modernize Now

Grid Safety Standards & Waste Bylaws

  • Aging oil-cooled transformers and outdated panels incur heavy no-load losses and fail contemporary fire insurance risk audits.
  • BMC DCPR 2034 and Solid Waste Management Rules 2016 strictly penalize commercial properties and societies that fail to process waste on-site.
  • Accelerated infrastructure capex: public tenders require immediate empanelment and validated financial eligibility.
In plain words

GRID APEX looks after electrical and energy projects. That covers the wiring and equipment inside a building, the heavy supply used by factories and hotels, and a patented waste treatment machine.

We plan the job, deal with the utility approvals and manage the project. The installation itself is done by experienced contractors that we have checked, so the right specialist does each part of the work.

Words you may see

HT (high tension)
The heavy supply used by factories, hotels and large buildings.
LT (low tension)
The normal supply used in homes, shops and offices.
Net metering
Your rooftop solar plant sends extra power to the grid, and the utility credits it on your bill.
kWp
The rated size of a solar plant, in kilowatts.

What we offer

(01) SCOPE

HT electrical work

Panels, switchgear, transformers and cable laying, with testing and commissioning.

(02) SCOPE

LT electrical work

Wiring, distribution panels, lighting, earthing and lightning protection.

(03) SCOPE

Maintenance contracts

Regular servicing and breakdown support for electrical systems.

(04) SCOPE

Rooftop solar and pergolas (Solis)

Dedicated solar EPC through Solis: elevated pergola arrays, BIPV architectural glass, EV charging hubs, net metering, and PM Surya Ghar subsidies.

(05) SCOPE

EV charging

AC and DC charging points for offices, housing societies and commercial sites.

(06) SCOPE

Solid waste machine

A patented machine that treats mixed waste on site without fuel or outside electricity. It holds a Central Government patent and is certified by the Maharashtra Pollution Control Board (MPCB).

(07) SCOPE

Help with government empanelment

Advice for electrical contractors who want to register with government bodies and bid for tenders in their own name.

How the process works

A structured four-step journey designed for clarity, fixed timelines, and zero surprises.

(01)

Site visit

We look at the site and understand what you need.

(02)

Plan and price

We prepare the design and a clear cost, with quotes from our partners.

(03)

Approvals

We handle the utility paperwork, including net metering for solar.

(04)

Installation and handover

Our partner installs and tests the system, and we hand it over to you.

Portfolio

We do not name clients. This is the kind of work our team and execution partners have done, and the work we usually take on.

Team experience

Rooftop solar for industrial plants

Rooftop plants for industrial users, from about 100 kWp to about 690 kWp across manufacturing and processing facilities.

Team experience

HT supply for hospitality properties

HT electrical work for hotels and hospitality properties in Mumbai and other cities.

Typical work

Wiring for homes, offices and shops

New wiring, distribution boards, lighting and earthing, and yearly maintenance.

Typical use

Waste treatment on site

For housing societies, campuses and businesses that want to treat their own waste where it is produced.

Interactive HT Substation & APFC Sizing Engine

Simulate connected industrial demand, incomer voltage level, and uncorrected power factor to compute recommended transformer ratings, APFC capacitor bank sizing, and demand penalty reversals.

[HT SUBSTATION LOAD & APFC SIZING ENGINE]

Technical Substation Load & Penalty Sizing.

Simulate connected factory demand, input voltage level, and uncorrected power factor to compute recommended transformer ratings, APFC capacitor bank sizing, and demand penalty reversals.

750 kW
100 kW2,500 kW5,000 kW
0.82 PF
0.70 (Severe Penalty)0.850.98 (Optimal)
Calculated Engineering Parameters6 to 8 weeks
Recommended Transformer Capacity
1,250 kVA
Includes 25% continuous thermal headroom | 100% Copper Winding ONAN
APFC Bank Needed
417 kVAR
Targets 0.99 Lag
Fault Rating
18.4 kA (3s)
IS 13947 Class
Estimated Penalty Avoidance
Rs 18,63,000 / year
Under MSEDCL / BEST HT-I industrial power factor surcharge matrix
Recommended HT Feeder: 3C x 120 sq.mm XLPE Al Armoured

People and partners

Leadership

Jitendra Chavan
Director
36 years of direct utility engineering experience.

Execution partners

Licensed electrical contractors
HT and LT installation
Solar installation companies
Rooftop plants and EV charging

Who does the work

Turnkey engineering governance is retained directly by GRID APEX engineers at One International Centre. Heavy on-site fabrication, transformer rigging, and high-tension terminations are executed by vetted, licensed Class-A electrical contracting associates under our direct quality and safety supervision.

[HIGH-TENSION ENGINEERING & THERMAL CLEANTECH]

Turnkey Substation Engineering & Patented Waste Pyrolysis.

High-voltage utility substations, MSEDCL 11kV/33kV bay erection, APFC power factor correction, and Central Government patented thermal waste decomposition technology.

Substation Bay Engineering

11kV / 22kV / 33kV Substation Bays & Switchgear

Turnkey engineering, procurement, and construction (EPC) for industrial substations, high-voltage vacuum circuit breakers (VCB), dry and oil-cooled transformers, and capacitor banks.

CEI drawing approvals and statutory clearance dockets
Transformer sizing, oil testing, and filtration protocols
APFC detuned capacitor banks for 0.99 power factor maintenance
HT underground cable laying and heat-shrink terminations
Full CEA & IS 2026 Code AdherenceTurnkey EPC
Central Govt Patented Technology

Thermal Solid Waste Pyrolysis Systems

Proprietary continuous thermal gasification and zero-residue decomposition technology transforming municipal and industrial solid waste into clean syngas and inert char.

95% volume reduction without toxic atmospheric emissions
MPCB certified continuous emissions monitoring compliance
Energy self-sustaining closed-loop thermal cycle
Zero dioxins, furans, or hazardous fly-ash generation
Patent No. 384912 / MPCB CertifiedCleantech Division
[STATUTORY CODES & TECHNICAL BENCHMARKS]

Certified High-Tension Standards & MPCB Norms.

Engineered to exact Central Electricity Authority (CEA) standards, Indian Standards (IS), and Maharashtra Pollution Control Board mandates.

CEA Regulations 2010

Central Electricity Authority Compliance

Statutory grid synchronization, insulation coordination, and clearance design for high-voltage and extra-high-voltage substations up to 33kV.

CEI / MSEDCL Verified
IS 2026 / IEC 60076

Power & Distribution Transformers

Low-loss ONAN oil-immersed and dry cast-resin transformers with copper winding, off-circuit tap changers or on-load tap changers (OLTC).

CEI / MSEDCL Verified
IS 13947 / IEC 62271

HT Vacuum Circuit Breakers (VCB)

Indoor and outdoor 11kV/33kV draw-out VCB panels rated up to 31.5 kA for 3 seconds with digital microprocessor numerical protection relays.

CEI / MSEDCL Verified
IS 3043 Code of Practice

Chemical Pipe Earth Grid (< 1.0 Ohm)

Multi-electrode earthing grid with step and touch potential dissipation calculations, maintaining combined resistance strictly below 1.0 Ohm.

CEI / MSEDCL Verified
Central Govt Patent 384912

Zero-Residue Thermal Cleantech

Patented catalytic thermolysis system achieving 95% solid waste volume reduction without atmospheric toxic fly-ash or dioxin release.

CEI / MSEDCL Verified
MPCB Air & Water Consent

Pollution Control Board Standards

Integrated Venturi scrubber and continuous emissions monitoring system (CEMS) certified under statutory State Pollution Board norms.

CEI / MSEDCL Verified
[COMMISSIONED ENGINEERING DOSSIERS]

Real Heavy Industrial Installations & Cleantech Plants.

Real-world commissioned substations, express feeders, and thermal decomposition facilities delivered across Maharashtra manufacturing clusters.

33kV Substation Bay & Express Feeder
Click to Inspect
5,000 kVA (5 MVA)
Tarapur MIDC, MaharashtraSubstation Bay & Line

33kV Substation Bay & Express Feeder

Dual 33kV incoming express feeder with 5 MVA ONAN transformer and automated SCADA telemetry.

Voltage Incomer
33 kV
Transformer
5 MVA
Fault Rating
31.5 kA
Sanction Authority
MSEDCL
Executed Technical Scope:
  • •Dual 33kV HT underground XLPE aluminium armoured feeder cables (3C x 300 sq.mm)
  • •Outdoor 5 MVA 33/0.433 kV step-down transformer with OLTC and nitrogen fire protection
  • •Indoor HT panel board with 4-breaker vacuum circuit breaker (VCB) configuration
  • •Automated remote telemetry unit (RTU) integrated with DISCOM regional load dispatch centre
Industrial Substation Modernization & APFC
Click to Inspect
2,500 kVA Modernization
Taloja MIDC Industrial Complex, MaharashtraPower Quality & Switchgear

Industrial Substation Modernization & APFC

Complete 2,500 kVA substation overhaul with 900 kVAR detuned capacitor bank, eliminating monthly penalty.

Initial PF
0.82 Lag
Corrected PF
0.99 Lag
Penalty Saved
Rs 4.2L / mo
Harmonic Atten.
THD < 4%
Executed Technical Scope:
  • •Automated power factor correction (APFC) panel with 7% detuned copper wound reactors
  • •Microprocessor relay replacement with IEC 61850 protocol communication compatibility
  • •Oil filtration, BDV testing (tested > 65 kV), and bushing gasket overhaul on 2,500 kVA unit
  • •Statutory inspection clearance from the Chief Electrical Inspectorate (CEI)
Municipal Solid Waste Thermal Gasifier
Click to Inspect
50 TPD Continuous Feed
Municipal Corporation Cleantech FacilityPatented Thermal Cleantech

Municipal Solid Waste Thermal Gasifier

Central Government patented thermal catalytic decomposition reducing municipal solid waste to sterile bio-char.

Throughput
50 TPD
Volume Reduction
95%
Patent Number
No. 384912
Emissions
MPCB Zero-Ash
Executed Technical Scope:
  • •Multi-stage thermal decomposition chamber operating at controlled 650°C to 850°C pyrolysis range
  • •Continuous emissions monitoring system (CEMS) tracking PM, SOx, and NOx in real time
  • •Closed-loop wet scrubbing system with zero liquid discharge (ZLD) effluent recirculation
  • •Sterile non-leachable mineral char output suitable for statutory road sub-base construction
Automotive Plant 11kV Compact Substation
Click to Inspect
1,600 kVA Dual CSS
Chakan Industrial Corridor, PuneCompact Substation (CSS)

Automotive Plant 11kV Compact Substation

Dual 1,600 kVA dry cast-resin compact substation with SF6 Ring Main Unit (RMU) for zero-downtime manufacturing.

Enclosure Rating
IP54 Outdoor
Dry Transformer
Cast Resin
Bus Coupler
Auto-Transfer
Uptime SLA
99.98%
Executed Technical Scope:
  • •Pre-fabricated modular enclosure certified under IEC 62271-202 internal arc classification
  • •Dry-type Class F insulation transformer eliminating oil contamination risks inside factory zones
  • •Three-way 11kV extensible SF6 gas insulated Ring Main Unit with motor operated isolators
  • •Main LT switchboard with motorized air circuit breakers (ACB) and automatic bus-tie logic
[HIGH-VOLTAGE TURNKEY TIMELINE]

Substation Erection & Energization Sequence.

From ETAP load flow study to live CEI charging permission: our 90-day execution framework coordinates civil plinths, transformer erection, and DISCOM synchronization.

(01)Days 1 to 20

Load Flow Study & Feasibility

ETAP load flow simulation, short-circuit withstand calculation, soil resistivity testing, and DISCOM transmission corridor right-of-way audit.

Milestone: Comprehensive Technical Feasibility Report & System Single Line Diagram (SLD).
(02)Days 21 to 45

Statutory CEI Sanctions & Procurement

Preparation and submission of statutory electrical dockets to the Chief Electrical Inspectorate (CEI) and utility clearance petitions.

Milestone: Approved CEI drawing endorsement and equipment manufacturing release.
(03)Days 46 to 80

Substation Erection & HT Cable Jointing

Reinforced concrete transformer plinth casting, HT switchgear positioning, heat-shrink cable termination, and chemical earth pit grid interconnect.

Milestone: Civil load test report, pre-commissioning HT cable megger and Hi-Pot dossier.
(04)Days 81 to 90

Relay Calibration, Charging & Energization

Secondary injection testing of numerical protection relays, transformer oil BDV verification, joint DISCOM meter sealing, and live bay energization.

Milestone: Formal CEI Charging Permission, MSEDCL energization protocol certificate.

Ready to discuss your project?

Reach out with your requirements. We will review what is needed and provide honest, transparent next steps.